Agent bind flow — storyboard

16 frames covering the agent-mediated bind path from "quote accepted" to "policy in force." Frames 9–18 cover the happy path (sourced from the Notion bind spec sections (1)–(12)); frames 19–24 cover edge cases, referrals, and admin states. Each frame lists the user stories it covers verbatim from the relevant Notion spec.

v1 — bind FORTIFIED™ Mode A · conditional bind out of scope at launch Hartley · 16573 Pine Valley Ct · $1,520/yr

Upstream: Agent quote storyboard (frames 1–8). Quote frame 8 (decline) and frame 6 (quote review) link into this storyboard at frame 9.

Bind happy path · frames 9–18

Frame 9 / 24
HO identity & effective date
Confirm the HO's legal name and lock the policy effective date. Entry point from the quote review.
Frame 10 / 24
Requirements checklist
What's needed to bind — HO3 attestation, mortgagee, billing path, AFFIDCA. Drives the rest of the flow.
Frame 11 / 24
HO3 attestation
Capture underlying HO3 carrier, policy #, effective dates, Cov A limit. Required pre-bind input.
Frame 12 / 24
Mortgagee capture
Lender name, loan #, mortgagee clause, billing contact. Required when billing path = escrow.
Frame 13 / 24
Billing path
Direct-bill (HO pays) or mortgage escrow (lender pays). Triggers different downstream Ascend setup.
Frame 14 / 24
AFFIDCA
Diligent search affidavit. Surplus lines requirement — HO confirms no admitted-market coverage available.
Frame 15 / 24
Coverage-gap review
Final coverage check before generating documents. Surface any gaps between underlying HO3 and Althea wind layer.
Frame 16 / 24
Set A ready
Doc Set A generated and ready for e-signature. Agent reviews, sends to HO.
Frame 17 / 24
Set A upload-back
HO has e-signed; documents are back. Ready to commit. Final gate before PAS atomic commit.
Frame 18 / 24
Bound state & payment status
Policy bound. Surface payment status (provisional bind / paid in force / escrow late). Post-bind view for the agent.

Edge cases & admin states · frames 19–24

Frame 19 / 24
Bind blocked: CAT suspension
Catastrophe-watch bind suspension in effect. Agent sees suspension notice; cannot proceed until cleared.
Frame 20 / 24
Bind referred: identity review
OFAC screen returned a possible match. Bind paused pending UW review.
Frame 21 / 24
HO3 expiration referral
Underlying HO3 expires within 6 months. Triggers UW review before bind can complete.
Frame 22 / 24
Commit re-validation failed
Re-validation at the commit gate failed — capacity, CAT suspension, or eligibility shift. Re-quote required; Set A voided.
Frame 23 / 24
Bind-void modal
Bound policy being voided — non-pay, fraud, or other. SLIP+ BO reversal triggered downstream.
Frame 24 / 24
Concurrency lock gate
Two agents racing on the same property. First-to-bind wins; second sees lock notice.

Archived versions

No archived versions yet
agent-bind is at v1. When a future redesign lands, the previous version will be snapshotted to agent-bind/archived/ and surfaced here as a card per archive directory.

Storyboard generated from Notion bind specs (1)–(12). For the quote storyboard see agent-quote. For the top-level prototype index see home.